Author Archives: Byron Dean

ESE Restore Vandalised Site.

ESE Restore Vandalised Site. ESE were called out to a site in Bolton to inspect the high voltage network after unwanted visitors vandalised site. The vandalism resulted in the site having no power, and the high voltage equipment being damaged. When ESE attended site the majority of the high & low voltage cables had been removed, and the transformer and switchgear had been badly vandalised. ESE removed all the vandalised

Read More

Holiday Park Upgraded

Holiday Park has switchgear upgrade ESE work with major holiday park to complete the install of new Eaton Xiria to form part of their High Voltage network. Working with the holiday park it was decided to revamp the oldest substation on site and replace the outdated Long and Crawford T4GF3 with a new 3 panel Eaton Xiria. Working outside the opening hours ESE were able to remove the old equipment

Read More

Premier Install for a Premier League Club

A Premier install for a Premier League Club. ESE have worked with UK Power Networks on a new installation at a Premier League Football Ground. ESE cable jointers carried out terminations on 11kV XLPE/SWA 300mm cable into four new substations at the new stadium, we were excited to be part of such ambitious project.

Read More

Share this page

Please leave this field empty.
Quote Form