ESE continue to work with the UK Largest Caravan Holiday Park company, to revamp their existing High Voltage networks.
Working along side the holiday park, it was decided that an upgrade of the high voltage equipment at two more of their parks was needed. These locations are two of the biggest holiday’s parks in the UK, and it is vital for the electricity supply not to be disrupted in working hours. With this in mind, ESE Ltd were able to work outside the Caravan Parks opening hours to minimise disruption.
ESE Ltd replaced the existing banks of Long and Crawford oil switches, with a new 3 and 4 panel Eaton Xiria switchboard. Removing the oil switches from site in an environmentally friendly way and recycle accordingly without any major disruption to site. The new equipment is housed in purpose build GRP substations to protect against the elements.
This removed all of the defected equipment from site, removing the suspension of operation and giving site complete control of the high voltage networks.
This will provide electrical stability for the upcoming holiday seasons. The parks has now been re-energised and are ready for the busy holiday seasons.
Posts By Topics
- general (61)
- Expert Electrical Contractors (9)
- Case Studies (8)
- High-Voltage Equipment Maintenance (8)
- Electrical Distribution Equipment (6)
- High Voltage (4)
- High Voltage Electrical Safety (3)
- High-Voltage Switchgear (2)
- Independent Connection Provider (2)
- Engineered Systems (Electrical) Ltd (1)