News | Engineered Systems Electrical

Ffestiniog Hydro Power Station | Engineered Systems Electrical

Written by Niamh Cooper | Jul 8, 2019 7:32:26 AM

 

Engineered Systems (Electrical) Ltd have been appointed to carry out the design, installation, testing, and commissioning of a new high voltage power and communications connection at Ffestiniog Power Station. This video shows the completed civil works to date.