Costco Crick Up and Running

ESE has completed the installation of new HV distribution equipment at the new Costco Warehouse in Northamptonshire, including the installation of 3 of our new EU specification ‘ECO’ transformers with ESE LV distribution pillars fitted to each transformer.

Our installation team installed over 700m of 11000V cable mostly at high level to feed each transformer from an ESE installed suit of 11000V switchgear. All equipment was installed and commissioned within a week, ensuring that Sheffield based JF Finnegan got their Warehouse on the 60 acre site on Dockham Way up and running on time.