For many sites, December is when next year’s budget takes shape. Figures are being asked for, and anything not on the list now tends to become an awkward request halfway through the year.
High voltage systems can be one of the harder lines to fill in. The work isn’t constant, and the bigger items don’t come up every year. But if your network has been maintained through the year, you already hold most of what you need: the findings.
Used well, those findings turn next year’s HV spend from a series of surprises into a plan. Here’s how we’d suggest approaching it.
Why look at the whole year, not just the latest report?
The most recent report is the one that’s front of mind, but it only shows part of the picture. Findings from earlier in the year, callouts and any repairs carried out all tell you something too.
Put side by side, they can show things a single report can’t:
- the same item coming up more than once
- equipment that has needed attention on more than one visit
- findings that were marked to monitor and haven’t changed, which may be ready to drop off the list
- findings that were marked to monitor and have changed, which may now need a plan
So, start by gathering everything in one place: each maintenance report from the year, notes from any callouts, and a list of work that’s been done since. A simple list with one line per finding is enough. It doesn’t need to be clever; it just needs to be complete.
We’ve written separately about deciding how to respond to an individual finding and what a good maintenance report should give you. This is the step after that: taking everything you’ve learned this year and deciding what it means for the next.
What goes in next year’s budget, and what can wait?
With the year’s findings in one list, the next job is to sort them into three groups:
- Next year’s budget: work that should happen in the coming year, whether that’s a repair, a replacement or something identified as needing attention before it gets worse
- Later years: work that’s real but not pressing, which can be pencilled in further ahead
- Keep watching: items with no cost attached yet, but which you’ll want to check again at the next visit
One caveat first. Anything that needs action now shouldn’t be waiting for a new budget. If something on your list falls into that category, it’s worth dealing with it separately and straight away.
For the rest, the aim is to be honest rather than cautious. Putting everything into next year inflates the budget and makes it harder to defend. Leaving everything out makes the year more likely to bring surprises. The findings themselves, and your engineers’ view of them, are what let you draw the line in a sensible place.
The “keep watching” group matters more than it looks. It’s not a cost line, but it’s a useful record. If one of those items does change during the year, you’ll already know it was being tracked, and it won’t arrive as a shock.
Can related work be grouped together?
Once you know what’s going into next year, look at how the items relate to each other. Several separate findings often turn out to be in the same substation, on the same part of the network, or needing the same kind of access.
Grouping them makes sense for a few reasons:
- many HV jobs need part of the site switched off, so doing related work together can mean one shutdown instead of several
- access, permits and preparation are arranged once rather than repeatedly
- one planned package is easier to explain and approve than a scattering of small requests
It also helps to have one contractor who can see the whole package. We can repair, supply and install as well as maintain, so a group of findings that mixes remedial work with a replacement can be planned and carried out together rather than split across suppliers.
We’ll look at shutdowns in more detail in our next article, including how to make the most of the quieter periods in your site’s year.
Should bigger jobs be spread over more than one year?
Sometimes the honest answer to a set of findings is a larger piece of work, such as replacing several pieces of switchgear. That doesn’t always have to land in a single year.
Where it’s practical, bigger work can often be phased: the items most in need of attention first, the rest in following years. That spreads the cost, keeps each year’s request reasonable, and still gives you a clear path to the end result. It’s worth deciding the order based on the condition and performance of each item, not simply which is oldest.
If you’re heading towards a replacement, our article on what happens when HV equipment needs replacing explains what the process involves.
What if you’re planning across several sites?
If you look after more than one site, the same approach works, but it pays to put every site’s findings into one combined view.
That makes it easier to:
- compare priorities fairly, so the budget goes where it’s most needed rather than to whichever site shouts loudest
- spot the same type of issue appearing at several sites, which may point to a shared solution
- balance the workload across the year, so not every site needs work in the same month
- see which sites have outstanding actions and which are up to date
This is much easier when every site’s reports follow the same format and use the same way of setting priorities. If they come from different contractors in different styles, the first job is often translating them into something comparable. Having one HV contractor across the estate takes that step away.
How do you make the case to finance or senior management?
HV spend can be hard to explain to people who don’t deal with it. The equipment is out of sight, it usually works, and the terms are unfamiliar. A request that simply says “switchgear works” with a figure next to it invites questions.
A few things make the case much easier:
- Start from the evidence. Explain that each item comes from a finding in this year’s maintenance, not from a general wish to spend.
- Say what it’s for in plain terms. What the equipment does for the site, and what the work keeps running.
- Show what’s been left out. Listing the items you’ve decided can wait, or keep watching, shows the budget has been thought through rather than padded.
- Show the plan, not just the cost. If a bigger job is phased over several years, set out the whole path so nobody is surprised by next year’s request.
- Be clear on timing. If the work needs a shutdown, say when that’s likely to be and who it affects.
Your maintenance contractor should be able to help here. Clear reports with priorities set out in plain English give you much of the wording you need, and we’re always happy to explain findings in terms that make sense to a budget holder.
Talk it through with us
If you’ve got this year’s findings in front of you and want a second view on what belongs in next year’s plan, we’d be glad to go through them with you. That might mean helping you sort priorities, suggesting how related work could be grouped, or explaining findings in a way that works for your budget holders.
It’s a straightforward conversation, and a good one to have before the budget is fixed rather than after.